Skip to content
Manufacturing in Surat since 1998

Wires, cables and harnesses
built to specification

31 standard product lines across automotive and industrial cable, elevator travelling cable, solar and instrumentation cable, enamelled winding wire, approval-ready power cords and build-to-print wire harnesses — each made against a named standard and tested before it ships.

  • IS & IEC constructions
  • JASO / DIN automotive
  • EN 50618 solar
  • IPC/WHMA-A-620 harnessing
  • Class 5 copper
  • Insulation
  • Outer sheath

25+

Years in cable manufacturing

31

Standard product lines

100%

Assemblies electrically tested

15+

Export markets served

Why buyers stay

Nothing leaves the plant unverified

Cable failures are expensive in the field and cheap to catch on the floor. Our process is built around catching them here.

Built to the written standard

Every construction is made against a named specification — IS, IEC, JASO, EN or your own drawing — not against a generic house recipe.

Tested, then released

Conductor resistance, spark, hipot and insulation resistance checks run on production lots, and every harness is electrically tested before packing.

One roof, full control

Drawing, stranding, extrusion, assembly and testing happen in the same plant, so a problem is traced back to its step instead of a supplier.

Documented dispatch

Test certificates, drum schedules and batch traceability go out with the consignment, so your incoming inspection has something to check against.

How we work

From drawing to dispatch

The same four steps run whether you are ordering a standard drum of house wire or a first-of-its-kind harness.

01

Specification

We review your drawing, standard or sample and confirm construction, compound and approvals in writing.

02

First article

A documented sample is produced and tested against the agreed specification before any series run is scheduled.

03

Series production

Lots run with in-line spark testing and dimensional checks, recorded against the batch.

04

Test & dispatch

Final electrical testing, certificates issued, packing and drum marking to your requirement.

Industries served

Specified by engineers who check

Our cable ends up in places where a callback is not an option — lift shafts, process plants, vehicle harnesses and rooftop arrays.

  • Automotive & e-mobility
  • Elevators & escalators
  • Solar & renewables
  • Data centres
  • Process plants
  • Appliance OEMs
  • Machine builders
  • Building & infrastructure

Certifications & test records

Management system certificates, product approvals and material compliance declarations, together with the in-house tests behind every batch.

See our certifications

Send us the specification

Share a drawing, a standard or just the application. We will come back with the construction we would build and what it will take to get there.

Chat on WhatsApp